The revised track plan for the Dragonfly Sub is shown below.
For the most part, I would consider this to be the "as-built" plans. The only exception is that the lift-out bridge... well does not lift-out, yet! (See previous post for discussion) All the track shown is in place and operational. The next step now is to begin wiring track leads from the previously installed DCC main bus line that runs under the layout.
Thanks for stopping.
All for now!
Scott
