Showing posts with label Trackplan. Show all posts
Showing posts with label Trackplan. Show all posts

Tuesday, September 1, 2009

Final Track Plan

This is the final track plan (at least for now) of the Dragonfly Subdivision (Tenth Subdivision of the CB&Q RR).









All the track is complete. Wiring and Scenery are next!

Thanks,
Scott

Friday, August 7, 2009

Revised/Updated Track Plan

The revised track plan for the Dragonfly Sub is shown below.



For the most part, I would consider this to be the "as-built" plans. The only exception is that the lift-out bridge... well does not lift-out, yet! (See previous post for discussion) All the track shown is in place and operational. The next step now is to begin wiring track leads from the previously installed DCC main bus line that runs under the layout.


Thanks for stopping.

All for now!

Scott


Saturday, May 30, 2009

Track Plan and Line Diagram


This is the most recent track plan I have for the railroad. It is relatively current. I have been doing some research and have changed the industry names to more closely reflect actual industries that would have existed in the late 1960's in each of the modeled towns. I have not updated the track plan to include these changes.


My operating scheme is still in the developmental stages, but the basic idea is a Mendota local would run from the staging yard to Prophetstown, making several "loops" to give some running time and distance. The local would drop the cars at Prophetstown and then pick-up the outbound cars and return to Mendota. This would all happen prior to the P-Town local coming on duty.


Once the P-Town local was on duty, it would classify the cars then run down the line working all trailing point sidings. I am also thinking that several trips around the loop again to give some distance and run time. Once all the industries have been served the local would turn and head back to Prophetstown with cars in tow and all the facing point sidings that were passed on the trip out would be worked heading back to Prophetstown. This means that the crew will have to classify the cars before starting the return trip to assure that cars to be set-out are not buried too deep in the train.




This is a line diagram of the railroad. Again, slightly out of date because it is a work in progress!

Thanks for stopping by!

Scott Stephenson