The story of the construction and operation of an HO scale model railroad.
Monday, September 12, 2011
Scenery Update
I have been working on the base scenery in and around the Green River area. I decided to add some "relief" to the otherwise flat benchwork and model some hills in the area between Green River and Ohio, Illinois. I have started with the basic newspaper formed hills covered with paper towels soaked with plaster of Paris. I have also incorporated the Green River riverbed into the scenery project, as it seemed to flow naturally from the hillside into the riverbank. I will post some pictures of the progress.
Tuesday, May 24, 2011
Green River Bridge Update 2
A quick update on the Green River Bridge construction. Below are some photos of the project.
Next will be the scenery including river banks.
The area of the Green River was originally built with the standard 2" foam base and cork roadbed. I planned to come back and remove the material when I was ready to construct the bridge. |
| Proposed location for the steel girder bridge. |
I used a trustworthy fine-toothed saw to make the precision cuts, after laying out the exact location of the steel girder bridge. I was careful to allow for adequate clearance for rolling stock negotiating the turnout to the left. |
| With the sawcuts complete, the spikes can be pulled and the track section removed. |
| Foam cut and gently removed with a wide blade putty knife. |
| First train across the new bridge! |
Scott
Subscribe to:
Posts (Atom)