I have started the next step in construction of the model railroad. The scenery construction is underway in the Walnut, Illinois area. I am currently working on the base scenery. I am tired of seeing the blue insulation board! My goal is to work in small areas and move progressively around the layout. I decided that I am going to take my time and enjoy learning this new part of the hobby. I will post additional photos of "finished" areas (at least the scenery base) as I have time. As a primer I will update the slide show to the right of this page with some current photos of work in progress. (Ya, I know I should have removed the tape from the rails!)
Thanks for visiting,
Scott
The story of the construction and operation of an HO scale model railroad.
Wednesday, November 24, 2010
Tuesday, September 7, 2010
Layout Progress Update
After finishing the track painting task, my intentions were to begin working on the scenery aspect of the railroad. While I have started to look at what I am going to do in different areas of the railroad, I have also been making some progress in another area of the hobby. I have been working on the components that will be attached to the fascia of the railroad. These items are largely informational for the operator as he/she operates over the Dragonfly Sub. The items I have decided (as of right now) to include on the fascia are the following:
Happy Railroading!
Scott
- Walk-around throttle plug-ins (Lenz DCC system). I have 5 panels positioned around the railroad that will accommodate all the operating schemes. Each panel will accept 2 throttles. Adjacent to each throttle panel is a Velcro pad that will allow throttles to be stored.
- Car card and waybill boxes. These are a vital part to the car forwarding/movement system of the railroad. Each car on the railroad has an associated car card that is used to hold a waybill. The waybill directs the railroad crews where the car goes on the layout. Each industry, the staging yard track, and yard track will have a dedicated "slot" for car cards. More discussion on car cards and waybills in later posts.
- Town names with railroad milepost locations. This is part of the illusion of model railroading. The illusion is representing 46.9 miles of railroad in a 11'x15' space. Instead of referring to a section of track as "over there in the corner," refer to it as "a section of track between MP (milepost) 39.5 to 39.9." This gives a whole new level of realism to the railroad. It is an actual location within a larger system.
- Another component that I am installing on the fascia at each town is a track diagram for the town. It is basically a blow up of the CAD line drawing I developed when designing the railroad. Again, more information for the operator. The track diagram shows the mainline, sidings, industrial spurs, and in some cases other railroads (like at Walnut- C.&N.W. R.R.).
Happy Railroading!
Scott
Subscribe to:
Posts (Atom)